by Cliff Co 4 min read
You have ordered one of the Best Barns barndominium kits and you are eager to start building. However, you cannot simply drop the lumber in a field and start swinging a hammer. The success of your build depends entirely on what happens before the materials arrive.
This phase is called building site prep. It is the process of turning raw land into a construction-ready pad. If you skip steps here, you will face drainage issues, shifting foundations, or expensive utility retrofits. We will guide you through the critical steps of clearing, grading, and connecting your utilities so your project starts on solid ground.
Before you move a single shovel of dirt, you must verify that you are allowed to build.
Zoning and Setbacks: Visit your local county planning office. You need to know the "setbacks," which are the required distances between your building and the property line. If you build your barn 10 feet from the fence but the code requires 15 feet, they can make you tear it down.
The Perc Test: If your land does not have city sewer access, you need a septic system. You must hire a professional to perform a percolation (perc) test. This tests how fast the soil absorbs water. If the soil fails the perc test, you cannot install a standard septic system, which might make the land unbuildable.

Building site prep begins with clearing. You need to remove trees, bushes, and large rocks from the building footprint.

Do not just clear the exact size of the kit (e.g., 16′×32′). You should clear at least 10 feet of extra space on all sides. This gives you room to set up ladders, store materials, and maneuver equipment.

Your foundation needs a flat surface. "Grading" involves scraping the high spots and filling the low spots.
Timing is everything. You generally want to install major underground utilities before you pour a concrete slab or build a floor system.
The Well: Drill the well first. The drilling rig is heavy and needs easy access. Once the well is dug, you will dig a trench to run the water line to where your utility room will be.
The Septic Tank: You can install the septic tank and drain field while the site is being graded.

Take photos of all open trenches before you bury the pipes. You will need to know exactly where that water line is five years from now when you decide to plant a tree.
This is a step many DIYers forget. Your barndominium kit will arrive on a large truck, often a semi-trailer or a long flatbed.
Driveway Width and Stability: If your driveway is a narrow, muddy trail, the driver might refuse to deliver.
Staging Area: Designate a flat, dry spot for the kit materials to sit. You do not want your premium lumber sitting in a puddle. Ideally, place the materials close to the foundation but not so close that they block your work.


Have any questions or would like to place an order? We'd love to help! Chat with our friendly customer service team by calling 1-844-945-3625, chatting in on our website or email us at customersupport@wildoaktrail.com. We look forward to hearing from you!
Site prep typically costs between $3,000 and $10,000, depending on the amount of tree clearing, grading, and excavation required for your specific lot.
Yes, if you have experience operating a skid steer or bulldozer. If you are inexperienced, hiring a pro is safer to ensure proper drainage and compaction.
Yes. You should lay the electrical conduit in the trench and have it come up through the foundation location before pouring concrete or building the floor.
A perc test measures the soil's absorption rate. It determines if your land can support a septic system and how large the drain field needs to be.
Clear at least 10 to 15 feet of extra space around the perimeter of the foundation to allow for ladders, scaffolding, and material storage during construction.